SAPOLIL RD over DRY CREEK

1.08 N SR 12 · County 071, Washington · Built 2006 · 2 Lanes · 210 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

46.122431, -118.236567

This bridge is in worse condition than 7.2% of bridges in County 071. The average bridge in Washington is 0 years old; this one is 20 years old.

Nearby Bridges

Bridge Details

Structure #
087417000000000
Year Built
2006
Length
36.6 m (120.1 ft)
Max Span
34.8 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
210
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,346,000
Total Project Cost
$4,693,000