COAL CREEK RD over DEEP CR

05.85 S OF SR 542 · County 073, Washington · Built 2000 · 2 Lanes · 15 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

48.852167, -121.922047

This bridge is in worse condition than 47.6% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 26 years old.

Nearby Bridges

Bridge Details

Structure #
087234000000000
Year Built
2000
Length
9.4 m (30.8 ft)
Max Span
9.1 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
15
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$740,000
Total Project Cost
$1,480,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.