BISHOP ROAD over DILLENBAUGH CREEK

1.11 SW CHEHALIS · County 041, Washington · Built 1955 · 2 Lanes · 3,654 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
087223000000000
Year Built
1955
Length
6.7 m (22 ft)
Max Span
3.4 m
Lanes
2
Daily Traffic
3,654
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$188,000
Total Project Cost
$376,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.