FIBRE WAY over Port of Longview RR

0.36 S INDUSTRIAL (SR 432 · County 015, Washington · Built 2002 · 2 Lanes · 4,250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

This bridge is in worse condition than 23% of bridges in County 015. The average bridge in Washington is 0 years old; this one is 24 years old.

Bridge Details

Structure #
087201000000000
Year Built
2002
Length
37.5 m (123 ft)
Max Span
35.7 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
4,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,227,000
Total Project Cost
$2,454,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.