3RD ST SW over C ST SW

0.3 W OF SR- 18 · County 033, Washington · Built 2002 · 2 Lanes · 9,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 7 Good
Substructure 7 Good

Location

47.3049, -122.233042

This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 24 years old.

Nearby Bridges

Bridge Details

Structure #
087193000000000
Year Built
2002
Length
43 m (141.1 ft)
Max Span
41.5 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
9,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,540,000
Total Project Cost
$3,081,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.