FAUCHER ROAD over ROZA CANAL
0.53 MI. S. OF MIERAS RD. · County 077, Washington · Built 2001 · 2 Lanes · 390 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.569561, -120.372086
This bridge is in worse condition than 5.6% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 25 years old.
Nearby Bridges
ST.HILAIRE ROAD over ROZA CANAL
Built 1985
MIERAS ROAD over ROZA CANAL
Built 1936
POSTMA ROAD over ROZA CANAL
Built 1969
FAUCHER ROAD over MOXEE DRAIN
Built 1964
RIVARD RD. S. over MOXEE DRAIN
Built 1969
WALTERS ROAD over MOXEE DRAIN
Built 1958
LAFRAMBOISE ROAD over MOXEE DRAIN
Built 1964
BEAUDRY ROAD over MOXEE DRAIN
Built 1971
BEAUCHENE ROAD over MOXEE DRAIN
Built 1958
BEAUCHENE ROAD over MOXEE DRAIN
Built 1971
Bridge Details
- Structure #
- 087037000000000
- Year Built
- 2001
- Length
- 15.5 m (50.9 ft)
- Max Span
- 15.2 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 390
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,101,000
- Total Project Cost
- $2,202,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.