MACADAM ROAD S. over S 133RD
0.3 S JCT SR599 · County 033, Washington · Built 1997 · 2 Lanes · 3,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.484711, -122.280178
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 29 years old.
Nearby Bridges
SR 599 over 133RD ST
Built 1966
SR 599 over 133RD ST
Built 1966
SR 599 over 42ND AVE S
Built 1968
SR 599 over 42ND AVE S / MACADAM RD
Built 1968
42ND AVE SO over DUWAMISH RIVER
Built 1949
SR 599 over I-5 (SB LANES ONLY)
Built 1966
I-5 SB HOV LANE over INTERURBAN AVE
Built 1996
I-5 P1 15559 RAMP over I-5 HOV LANE
Built 1966
I-5 over INTERURBAN AVE
Built 1966
I-5 over INTERURBAN AVE
Built 1966
Bridge Details
- Structure #
- 086742000000000
- Year Built
- 1997
- Length
- 19.5 m (64 ft)
- Max Span
- 18.9 m
- Width
- 12.1 m (39.7 ft)
- Lanes
- 2
- Daily Traffic
- 3,600
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,336,000
- Total Project Cost
- $2,671,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.