THIRD STREET over REBEL FLAT CREEK
0.01 S INT. DEAN AVE · County 075, Washington · Built 2001 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.92655, -117.68855
This bridge is in worse condition than 16.6% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 25 years old.
Nearby Bridges
SOUTH ENDICTT/6140 over REBEL FLAT CREEK
Built 1964
REPP/6200 over REBEL FLAT CREEK
Built 1997
SWENT/6080 over REBEL FLAT CREEK
Built 1978
ENDICOTT/4000 over REBEL FLAT CREEK
Built 1979
KACKMAN/4210 over PALOUSE RIVER
Built 1991
WALTER SCHOLZ/6150 over UNION FLAT CREEK
Built 1974
LUFT/6130 over UNION FLAT CREEK
Built 1974
LNG JN MORASH/6020 over UNION FLAT CREEK
Built 1988
ENDICOTT/4000 over REBEL FLAT CREEK
Built 1975
WINONA SOUTH/6000 over REBEL FLAT CREEK
Built 1970
Bridge Details
- Structure #
- 086647000000000
- Year Built
- 2001
- Length
- 15.8 m (51.8 ft)
- Max Span
- 15.2 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $321,000
- Total Project Cost
- $642,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.