OVERPASS TO T-5 over W. MARGINAL WY S.W.
0.9 MI. W. OF SR 99 · County 033, Washington · Built 1997 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
47.570994, -122.356333
This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 29 years old.
Nearby Bridges
SW SPOKANE ST over KLICKITAT E MARGINAL RR
Built 1991
SW SPOKANE ST over DUWAMISH RIVER W WATERWY
Built 1983
SW SPOKANE ST over DUWAMISH RIVER E WATERWY
Built 1976
SW SPOKANE ST over DELRIDGE WAY SW
Built 1983
SW SPOKANE ST over DELRIDGE WAY SW
Built 1983
16TH AVE SW over KLICKITAT AVE SW RR
Built 2001
SW SPOKANE ST over W WATERWAY OF DUWAMISH
Built 1991
SW NEVADA ST over LONGFELLOW CREEK
Built 1988
SW SPOKANE ST over RR
Built 2001
HARBOR AVE SW over RR
Built 2001
Bridge Details
- Structure #
- 086386000000000
- Year Built
- 1997
- Length
- 415.4 m (1362.9 ft)
- Max Span
- 60.4 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $24,782,000
- Total Project Cost
- $49,565,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.