MONUMENT HILL ROAD over IRRIGATION CANAL
P NW 0.6 North of 12 NW · County 025, Washington · Built 1996 · 2 Lanes · 298 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
47.270642, -119.832211
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 30 years old.
Nearby Bridges
P NW over CANAL W26A BLK 73
Built 1993
P NW over LAT. BLK 73
Built 1996
Farm Access over West Canal W26C lateral
Built 2000
Q RD NW over IRRIGATION LATERAL
Built 1952
MARTIN ROAD over WASTEWAY
Built 1952
MAINTENANCE ROAD over WEST CANAL
Built 1951
MAINTENANCE ROAD over DW231 WASTEWAY
Built 2015
Q - NW over IRRIGATION CANAL
Built 2003
R RD NW over IRRIGATION LAT.
Built 1952
Martin Rd over WASTEWAY
Built 1952
Bridge Details
- Structure #
- 086340000000000
- Year Built
- 1996
- Length
- 11.6 m (38.1 ft)
- Max Span
- 11.3 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 298
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $866,000
- Total Project Cost
- $1,733,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.