US 97 over CASCADE CANAL

1.8 N JCT SR 10 · County 037, Washington · Built 1900 · 2 Lanes · 2,702 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
086143000000000
Year Built
1900
Length
6.7 m (22 ft)
Max Span
6.7 m
Lanes
2
Daily Traffic
2,702
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$194,000
Total Project Cost
$387,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.