HIGH BRIDGE RD over RICCI CREEK
4.6 N KING CO LINE · County 061, Washington · Built 1994 · 2 Lanes · 1,733 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.821186, -122.039331
This bridge is in worse condition than 11.2% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 32 years old.
Nearby Bridges
SR 522 over SNOHOMISH R & TESTER RD
Built 1963
SR 522 over SNOHOMISH R & TESTER RD
Built 2013
SR 522 over ELLIOTT RD
Built 1963
SR 522 over ELLIOTT ROAD
Built 2013
SR 522 over WILDLIFE CROSSING
Built 2012
HIGH BRIDGE RD over TRIB. SNOQUALMIE RIVER
Built 1983
SR 522 over FALES RD
Built 2006
CRESCENT LAKE RD. over SNOQUALMIE RIVER
Built 1996
TUALCO LOOP RD over RILEY SLOUGH
Built 1970
SR 522 over W MAIN ST (164TH ST SE)
Built 2012
Bridge Details
- Structure #
- 086129000000000
- Year Built
- 1994
- Length
- 28.1 m (92.2 ft)
- Max Span
- 25.9 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,733
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,846,000
- Total Project Cost
- $3,693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.