S RD NE over EAST LOW CANAL
S NE 0.1 North of I-90 · County 025, Washington · Built 1995 · 2 Lanes · 133 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.087161, -119.087014
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 31 years old.
Nearby Bridges
1 RD SE over WEBER WASTEWAY
Built 1950
East Low Canal over East Low Canal
Built 1950
WARDEN RD/ROAD U over I-90
Built 1966
Q RD over I-90
Built 1965
Q RD NE over EAST LOW CANAL
Built 1992
Maintenance Road over East Low Canal
Built 1950
U ROAD SE over WEBER COULEE
Built 1954
East Low Canal over East Low Canal
Built 1950
R RD SE over Lind Coulee
Built 1966
3 SE over LIND COULEE
Built 1966
Bridge Details
- Structure #
- 086095000000000
- Year Built
- 1995
- Length
- 38.1 m (125 ft)
- Max Span
- 37.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 133
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $890,000
- Total Project Cost
- $1,781,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.