THIRD STREET over STOWE CREEK

2.5 BLKS S SR 6 · County 041, Washington · Built 1994 · 2 Lanes · 600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 8 Very Good

Location

46.567883, -123.3001

This bridge is in worse condition than 15.5% of bridges in County 041. The average bridge in Washington is 0 years old; this one is 32 years old.

Nearby Bridges

Bridge Details

Structure #
086088000000000
Year Built
1994
Length
15.2 m (49.9 ft)
Max Span
14 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
600
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$344,000
Total Project Cost
$689,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.