COLUMBIA DR over DRAIN DITCH
1.1 EAST CCB · County 005, Washington · Built 1944 · 2 Lanes · 2,350 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
46.240783, -119.253642
This bridge is in worse condition than 93.4% of bridges in County 005. The average bridge in Washington is 0 years old; this one is 82 years old.
Nearby Bridges
SR 240 over OLD SR 12/COLUMBIA PK TR
Built 2006
STEPTOE DRIVE over CID CANAL
Built 1999
SR 240 over WETLAND
Built 2007
COLUMBIA PRK TRAIL over COLUMBIA IRR DIST CANAL
Built 1929
SR 240 over YAKIMA RIVER
Built 2005
SR 240 over YAKIMA RIVER
Built 2004
SR 240 W-W RAMP over I-182
Built 1984
SR 240 RAMP over I-182 RAMP
Built 1984
I-182 S-E RAMP over SR 240/GEO WASH WAY
Built 1983
S-E RAMP over I-182
Built 1984
Bridge Details
- Structure #
- 085970000000000
- Year Built
- 1944
- Length
- 12.2 m (40 ft)
- Max Span
- 11 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,350
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $902,000
- Total Project Cost
- $1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.