SR 262 over POTHOLES CANAL
17.5 N JCT SR 26 · County 025, Washington · Built 1949 · 2 Lanes · 1,601 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
46.982739, -119.258492
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 77 years old.
Nearby Bridges
SR 262 over GENERATOR BYPASS CHUTE
Built 1989
MORGAN LAKE ROAD over POTHOLES CANAL
Built 2002
SR 262 over OSULLIVAN DAM OUTLET
Built 1973
M ROAD SE over LIND COULEE WASTEWAY
Built 1953
M Road SE over WW RCD BLK 42
Built 1996
5 RD SE over IRRIGATION WASTEWAY
Built 1987
M Road SE over EL 29 Waste Way
Built 1980
4 RD SE over WASTEWAY
Built 1987
4 SE over Irrigation Drainage
Built 2008
3 RD SE over WASTEWAY
Built 1987
Bridge Details
- Structure #
- 085905000000000
- Year Built
- 1949
- Length
- 7.6 m (24.9 ft)
- Max Span
- 3.2 m
- Lanes
- 2
- Daily Traffic
- 1,601
- Material
- Concrete
- Design
- Culvert
- Owner
- Bureau of Reclamation
- Last Inspected
- N/A
- Est. Improvement
- $178,000
- Total Project Cost
- $356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.