GREENLEAF DRIVE over LITTLE SPOKANE RIVER

0.1 S LITTLE SPOKANE DR · County 063, Washington · Built 1990 · 2 Lanes · 1,422 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
085822000000000
Year Built
1990
Length
38.4 m (126 ft)
Max Span
38.1 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
1,422
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,257,000
Total Project Cost
$2,514,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.