MARSH ROAD over LATAH CREEK

0.1 MI S LATAH · County 063, Washington · Built 1988 · 2 Lanes · 37 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
085760000000000
Year Built
1988
Length
45.4 m (149 ft)
Max Span
45.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
37
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,132,000
Total Project Cost
$2,265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.