PINE BLUFF ROAD over COULEE CREEK
0.2 N SEVEN MI RD · County 063, Washington · Built 1990 · 2 Lanes · 123 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.747472, -117.556578
This bridge is in worse condition than 51.1% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 36 years old.
Nearby Bridges
SEVEN MILE ROAD over DEEP CREEK
Built 1958
7-MILE ROAD over COULEE CREEK
Built 2016
SEVEN MILE ROAD over SPOKANE RIVER
Built 1992
CHARLES ROAD over SPOKANE RIVER
Built 1976
SR 291 over LITTLE SPOKANE R
Built 1966
GARFIELD ROAD over DEEP CREEK
Built 1987
RUTTER PARKWAY over LITTLE SPOKANE RIVER
Built 1960
EUCLID ROAD over BNSF RR TRACKS
Built 2023
EUCLID ROAD over DEEP CREEK
Built 1987
RAMBO ROAD over DEEP CREEK
Built 1995
Bridge Details
- Structure #
- 085756000000000
- Year Built
- 1990
- Reconstructed
- 2003
- Length
- 54.6 m (179.1 ft)
- Max Span
- 20.7 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 123
- Material
- Prestressed Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,276,000
- Total Project Cost
- $2,551,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.