CHESTNUT ST-BAY ST over BURLINGTON NORTHERN

AT JCT W CHESTNUT/BAY ST · County 073, Washington · Built 1930 · 2 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
085526000000000
Year Built
1930
Reconstructed
1988
Length
91.4 m (299.9 ft)
Max Span
11 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
6,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,565,000
Total Project Cost
$5,130,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.