MAIN STREET over NOOKSACK RIVER

AT FRONT ST · County 073, Washington · Built 1950 · 2 Lanes · 21,350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

48.845553, -122.588653

This bridge is in worse condition than 47.6% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 76 years old.

Nearby Bridges

Bridge Details

Structure #
085500000000000
Year Built
1950
Reconstructed
2004
Length
130.8 m (429.1 ft)
Max Span
33.5 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
21,350
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,464,000
Total Project Cost
$6,928,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.