YESLER WAY over 4TH AVE S

4th Ave S & Yesler Way · County 033, Washington · Built 1909 · 3 Lanes · 8,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
085047000000000
Year Built
1909
Reconstructed
2017
Length
25 m (82 ft)
Max Span
25 m
Width
23.3 m (76.4 ft)
Lanes
3
Daily Traffic
8,000
Material
Steel
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$857,000
Total Project Cost
$1,714,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.