KACKMAN/4210 over DOWNING CREEK

0.06 MI S LANCASTER · County 075, Washington · Built 1979 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
084830000000000
Year Built
1979
Length
30.5 m (100.1 ft)
Max Span
30.2 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,986,000
Total Project Cost
$3,971,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.