KENT-BLK DIAMOND over BNSF RR

AT SE 291ST · County 033, Washington · Built 1931 · 2 Lanes · 7,700 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
7
Good
Superstructure
5
Fair
Substructure
3
Serious

Bridge Details

Structure #
084811000000000
Year Built
1931
Reconstructed
1968
Length
31.4 m (103 ft)
Max Span
7.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
7,700
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,040,000
Total Project Cost
$4,079,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.