GARFLD-FRMGTN/1300 over BRANCH SILVER CREEK

9.13 MI SW FARMINGTON · County 075, Washington · Built 1975 · 2 Lanes · 238 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
084758000000000
Year Built
1975
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
238
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$650,000
Total Project Cost
$1,300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.