B ROAD NW over WEST CANAL BLK 701

B NW .2 N of 18 NW · County 025, Washington · Built 1975 · 2 Lanes · 714 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
084756000000000
Year Built
1975
Length
54.9 m (180.1 ft)
Max Span
26.8 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
714
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,430,000
Total Project Cost
$6,859,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.