ESTES/5300 over BRANCH FOUR MILE CREEK

00.20 MI E SR 27 · County 075, Washington · Built 1973 · 2 Lanes · 123 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
084698000000000
Year Built
1973
Length
12.2 m (40 ft)
Max Span
11.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
123
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$902,000
Total Project Cost
$1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.