COTTONWOOD CANYON over COTTONWOOD CREEK

00.01 SW BARBER RD · County 077, Washington · Built 1976 · 2 Lanes · 680 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
084673000000000
Year Built
1976
Length
6.7 m (22 ft)
Max Span
6.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
680
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$578,000
Total Project Cost
$1,155,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.