FALLERT RD over KALAMA RIVER

0.03 E KAL RIV RD (4.41) · County 015, Washington · Built 1985 · 1 Lanes · 200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

46.047122, -122.781853

This bridge is in worse condition than 52.8% of bridges in County 015. The average bridge in Washington is 0 years old; this one is 41 years old.

Nearby Bridges

Bridge Details

Structure #
084563000000000
Year Built
1985
Length
64.9 m (212.9 ft)
Max Span
60 m
Width
5.1 m (16.7 ft)
Lanes
1
Daily Traffic
200
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,754,000
Total Project Cost
$5,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.