THOMAS ROAD over NANEUM CREEK

00.57 W NANEUM ROAD · County 037, Washington · Built 1955 · 2 Lanes · 308 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
084348000000000
Year Built
1955
Reconstructed
1960
Length
10.7 m (35.1 ft)
Max Span
10.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
308
Material
Concrete Continuous
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$812,000
Total Project Cost
$1,624,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.