COUGHLIN ROAD over S FK NEWAUKUM RIVER

1.0 E ONALASKA · County 041, Washington · Built 1922 · 2 Lanes · 27 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
084294000000000
Year Built
1922
Reconstructed
1966
Length
30.5 m (100.1 ft)
Max Span
24.7 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
27
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,986,000
Total Project Cost
$3,971,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.