NORTH TOUCHET ROAD over NORTH TOUCHET RIVER

11.18 SE JCT SR 12 · County 013, Washington · Built 1973 · 2 Lanes · 350 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
084276000000000
Year Built
1973
Length
14 m (45.9 ft)
Max Span
14 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$328,000
Total Project Cost
$656,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.