RAGAN RD. over WAPATO CANAL
00.39 E OF LAT B RD · County 077, Washington · Built 1953 · 2 Lanes · 450 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.500936, -120.495836
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 73 years old.
Nearby Bridges
LATERAL A RD. over USIS CANAL
Built 1978
LUNDBERG RD. over USIS CANAL
Built 2001
LATERAL A RD. over WAPATO CANAL
Built 1999
KAYS RD. over WAPATO CANAL
Built 1965
SR 97 over WAPATO CANAL
Built 1948
US 97 over WAPATO CANAL
Built 1958
LATERAL B RD. over USIS CANAL
Built 1956
PARKER BRIDGE RD over YAKIMA RIVER
Built 1999
LAT 1 RD. over USIS MAIN CANAL
Built 1972
LAT C RD. over USIS MAIN CANAL
Built 1941
Bridge Details
- Structure #
- 084058000000000
- Year Built
- 1953
- Length
- 25.9 m (85 ft)
- Max Span
- 6.4 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 450
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,715,000
- Total Project Cost
- $3,430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.