COUNTY ARTERIAL over POTHOLES EAST CANAL
0.43 W SHF. WY 693 · County 021, Washington · Built 1957 · 2 Lanes · 327 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 8 | Very Good |
Location
46.576753, -119.074794
This bridge is in worse condition than 85.7% of bridges in County 021. The average bridge in Washington is 0 years old; this one is 69 years old.
Nearby Bridges
COUNTY HIGHWAY over POTHOLES EAST CANAL
Built 1956
COUNTY ROAD over POTHOLES EAST CANAL
Built 1957
COUNTY ROAD over POTHOLES EAST CANAL
Built 1957
COUNTY ARTERIAL over POTHOLES CANAL
Built 2014
SHEFFIELD ROAD over OLD RAILROAD BED
Built 1969
COUNTY ARTERIAL over POTHOLES EAST CANAL
Built 1957
COUNTY ARTERIAL over POTHOLES EAST CANAL
Built 1956
COUNTY ARTERIAL over POTHOLES CANAL
Built 2003
SHEFFIELD ROAD over ESQUATZEL COULEE WASTE W
Built 1978
MERION ROAD over POTHOLES EAST CANAL
Built 1952
Bridge Details
- Structure #
- 083963000000000
- Year Built
- 1957
- Length
- 18 m (59.1 ft)
- Max Span
- 9.1 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 327
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,246,000
- Total Project Cost
- $2,491,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.