CHELAN FALLS ROAD over CHELAN RIVER
00.20N CHELAN FALLS · County 007, Washington · Built 1976 · 2 Lanes · 1,089 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.805056, -119.984167
This bridge is in worse condition than 56.8% of bridges in County 007. The average bridge in Washington is 0 years old; this one is 50 years old.
Bridge Details
- Structure #
- 083893000000000
- Year Built
- 1976
- Length
- 153 m (502 ft)
- Max Span
- 30.5 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,089
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,769,000
- Total Project Cost
- $9,538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.