CENTERVILLE HWY over SWALE CREEK

10.7 W JCT SR 97 · County 039, Washington · Built 1977 · 2 Lanes · 270 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
083440000000000
Year Built
1977
Length
45.7 m (149.9 ft)
Max Span
9.8 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
270
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,069,000
Total Project Cost
$2,138,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.