DEKKER ROAD over ROZA CANAL
00.04 S CHAPELLE RD · County 077, Washington · Built 1971 · 2 Lanes · 840 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.411017, -120.125147
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 55 years old.
Nearby Bridges
OUTLOOK RD. N. over ROZA CANAL
Built 1974
BEAM ROAD over ROZA CANAL
Built 1971
GURLEY ROAD over SVID CANAL
Built 1991
DEKKER RD. over SVID CANAL
Built 2002
BEAM ROAD over SVID CANAL
Built 1969
OUTLOOK RD. N. over SVID CANAL
Built 1969
THACKER ROAD over SVID CANAL
Built 1960
GRANGER RD. N. over SVID CANAL
Built 1974
HUDSON ROAD over DRAIN
Built 2007
MAPLE GROVE ROAD over ROZA CANAL
Built 1976
Bridge Details
- Structure #
- 083329000000000
- Year Built
- 1971
- Length
- 22.9 m (75.1 ft)
- Max Span
- 22.6 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 840
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,534,000
- Total Project Cost
- $3,068,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.