FOLEY RD over LATERAL EL68 328+26.61

0.5 MI W OF SR 17 · County 001, Washington · Built 1988 · 2 Lanes · 216 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
083088000000000
Year Built
1988
Length
14.1 m (46.3 ft)
Max Span
13.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
216
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,014,000
Total Project Cost
$2,029,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.