COUNTY HIGHWAY over POTHOLES CANAL

0.07E SAGEHILL 400 · County 021, Washington · Built 1956 · 2 Lanes · 1,178 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
083032000000000
Year Built
1956
Reconstructed
1974
Length
15.5 m (50.9 ft)
Max Span
7.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,178
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,101,000
Total Project Cost
$2,202,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.