ROCK SPRINGS/7030 over WILLOW CREEK

0.07 MI SW SR 26 · County 075, Washington · Built 1971 · 2 Lanes · 63 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
082934000000000
Year Built
1971
Length
32.9 m (107.9 ft)
Max Span
15.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
63
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,130,000
Total Project Cost
$4,260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.