WISHKAH ROAD over ELLISON DIP

03.9 N ABERDEEN · County 027, Washington · Built 1986 · 2 Lanes · 1,651 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
082876000000000
Year Built
1986
Length
45.7 m (149.9 ft)
Max Span
8.5 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,651
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,888,000
Total Project Cost
$5,776,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.