Mary M Knight Rd over DRY CREEK

0.15 W of MatlockBradyRD · County 045, Washington · Built 1970 · 1 Lanes · 148 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
082799000000000
Year Built
1970
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
6.5 m (21.3 ft)
Lanes
1
Daily Traffic
148
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$400,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.