SILVER CK RD 00670 over SAN POIL RIVER
00.03 E SR 21 · County 019, Washington · Built 1961 · 2 Lanes · 325 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
48.084028, -118.691258
This bridge is in worse condition than 45.5% of bridges in County 019. The average bridge in Washington is 0 years old; this one is 65 years old.
Bridge Details
- Structure #
- 082777000000000
- Year Built
- 1961
- Length
- 44.5 m (146 ft)
- Max Span
- 18.3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 325
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,816,000
- Total Project Cost
- $5,632,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.