COUNTY ROAD over EAST LATERER #85

2.03 N JCT SR 260 · County 021, Washington · Built 1973 · 2 Lanes · 266 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
082211000000000
Year Built
1973
Length
11.9 m (39 ft)
Max Span
11.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
266
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$884,000
Total Project Cost
$1,769,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.