OHOP VALLEY RD E over OHOP CREEK

1.6 E JCT SR 7 · County 053, Washington · Built 1988 · 2 Lanes · 145 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
082202000000000
Year Built
1988
Length
18 m (59.1 ft)
Max Span
17.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
145
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,246,000
Total Project Cost
$2,491,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.