TAUSCHER ROAD over N FK NEWAUKUM RIVER

2.0 E FOREST · County 041, Washington · Built 1991 · 2 Lanes · 270 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
082075000000000
Year Built
1991
Length
37.5 m (123 ft)
Max Span
25.6 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
270
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$788,000
Total Project Cost
$1,577,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.