Madrona Beach Road over PERRY CREEK

0.6 W Mud Bay Rd · County 067, Washington · Built 1958 · 2 Lanes · 1,325 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

47.052194, -123.001714

This bridge is in worse condition than 61.3% of bridges in County 067. The average bridge in Washington is 0 years old; this one is 68 years old.

Nearby Bridges

Bridge Details

Structure #
081544000000000
Year Built
1958
Length
31.1 m (102 ft)
Max Span
20.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,325
Material
Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,022,000
Total Project Cost
$4,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.