URQUHART AVE(X NE) over CRAB CREEK

0.03 S OF BURN ST · County 025, Washington · Built 1972 · 2 Lanes · 170 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
081497000000000
Year Built
1972
Length
48.8 m (160.1 ft)
Max Span
21.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
170
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,444,000
Total Project Cost
$2,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.