320 ST E over SOUTH CREEK

.47 E JCT SR7 · County 053, Washington · Built 1934 · 2 Lanes · 600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
081441000000000
Year Built
1934
Reconstructed
1953
Length
18 m (59.1 ft)
Max Span
8.8 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
600
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,049,000
Total Project Cost
$2,098,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.