TIETON RESERVOIR over TIETON RIVER N. FORK

03.21 SW SR12 (WI) · County 077, Washington · Built 1956 · 2 Lanes · 550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
081296000000000
Year Built
1956
Length
42.7 m (140.1 ft)
Max Span
18.3 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
550
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,708,000
Total Project Cost
$5,415,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.